MABI ERP system · Production

Production with cost of goods calculated from shop floor to ledger

Recipes, routings, work orders and shop-floor terminals. Stage costs, yield and variances reach accounting without a spreadsheet, and an overproduction alarm calls the foreman.

What it solves

Today

Cost of goods is calculated in a spreadsheet once a month.

In MABI

Stage and material costs reach the ledger as they happen.

Today

The manager learns about overproduction after the shift.

In MABI

The order overrun alarm reaches the foreman immediately.

Today

Labels are printed from a separate program.

In MABI

Zebra labels print from the terminal on the work order.

Key features

  • Recipes, work orders, receipts and issues
  • Routings and stage costs, shop-floor terminals
  • Zebra labels, OEE and line efficiency
  • Cost of goods, variances and yield
  • Serial numbers with nameplates and batch genealogy

What ERP systems usually lack

AI

An overproduction alarm with an AI phone call to the foreman.

Usually the overrun shows up in the next day's report.

One database

Cost of goods calculated from shop floor to ledger without a spreadsheet.

Usually a cost controller assembles it from several exports.

Automation

Serial numbers with nameplates generated when the product is received.

Usually numbers are kept in a notebook or spreadsheet.

Module versions

A higher version includes everything from the lower one.

2,990 PLN/mo
  • Recipes, work orders, production receipts and issues
  • Routings and stage costs, terminals
  • Zebra labels, OEE and efficiency
  • Cost of goods and variances, yield
  • Work order overrun alarm
  • Serial numbers, batch genealogy

A module is switched on for the whole company on a monthly subscription, not per seat. The Lite / Pro / Enterprise version applies to one module. There are no bundles.

  • Data hosted in the EU (Hetzner, OVH)
  • Implementation faster than with typical ERP systems — measured in weeks, not months.

See the module live

We'll show it on your company's processes and work out the price for your team.